top of page

PROPERTY PROJECTS


Below is a list of projects currently needing attention on the CLC campus. Thank you for taking the time to review this list and for considering how you might help. Your willingness to serve plays a meaningful role in advancing the Kingdom of God.
If you are able to Complete any of these projects please let Pastor Alex know by sending him a text message at 727-729-9560.
Volunteer Form
Project Name | Location | Issue Description | Urgent | Reported Date | Project Image |
|---|---|---|---|---|---|
Fix Pavers | Outside Front Entrance | This requires someone with the skill and ability to cut the pavers and finish the pattern. They will then need to be reinforced with cement on the perimeter. | No | 02/04/2026 | |
Remove Black Plastic | Front Entrance Flower Bed | The black plastic in the front entrance flower bed can be removed along with the metal stakes that hold the plastic down. It can be thrown in the dumpster. | No | 02/04/2026 | |
Entrance Posts | Drive In Entrance | Either remove the posts or make them straight. Also we can possibly clean or paint them to look fresh unless we take them out. | No | 02/04/2026 | |
Traffic Sign Fix | Drive In Entrance | Straighten the post. Flatten out and clean the “no thru traffic” sign and other signs that are attached.
| No | 02/04/2026 | |
Remove Weeds (Parking Lot Islands) | Parking Lot | Remove all weeds from parking lot islands | No | 02/04/2026 | |
Clear Parking Lot Drains | Parking Lot | Blow leaves away from drains | No | 02/04/2026 | |
Fix Outdoor Electrical Post | Parking Lot Island | The light post that broke needs to be removed and the electrical wires need to but encased in an outdoor electrical box. | No | 02/04/2026 | |
Reinforce Pavers in Parking Lot Island | Parking Lot Island | Reinforce the pavers with concrete barrier | No | 02/04/2026 | |
Reinforce Pavers Near Lobby Entrance | Near Lobby Entrance | Reinforce the pavers with concrete barrier | No | 02/04/2026 | |
Replace Light Bulb | Under Lobby Entrance Awning | Change out the non working light bulb | No | 02/04/2026 | |
Pull Weeds in Sidewalk Cracks | All over the campus | Pull any weeds that are growing through the cracks in the sidewalks and spray with weed preventer/killer | No | 02/04/2026 | |
Make Edge with String Trimmer | Daycare Playground | Use a string trimmer to make an edge along where the parking lot meets the grass in front of the daycare playground. See Image. | No | 02/04/2026 | |
Blow Daycare Entrance | Back of the Campus | Use leaf blower to blow the daycare entrance | No | 02/04/2026 | |
Clear Drain of Debris | Back of the Campus | Blow the leaves from the drain. See Image. | No | 02/04/2026 | |
Clean Shed Area | Sheds in the Back | Clear the area around the sheds to make it more presentable for Daycare | No | 02/04/2026 | |
Clean Basketball Area | Basketball Area | Clean up the area in between the sheds and the basketball goal. See Image. | No | 02/04/2026 | |
Trim Palm Tree (Main Entrance) | Front Lobby Entrance | Trim the extra growth off of the palm tree. See Image. | No | 02/04/2026 | |
Trim Palm Tree (Fellowship Hall) | Fellowship Hall Entrance Area | Trim dead leaves | No | 02/04/2026 |


ONCE COMPLETED...
...let Pastor Alex know by sending him a text message at 727-729-9560.
bottom of page
